unfinished ships, well-known trawlers project 1288, such as "Pulkovo
Meridian", "General Troshev", etc.
1) The body of the trawler, No. 618 was launched on 07.1997, the readiness
of 45% - steel casing with system pipelines, solid ballast and devices -
2459.6 tons (metal casing, welded things, masts, foundations,
reinforcements, etc.); mechanisms and equipment - 199.4 tons
2) Trawler body, No. 619 - launched on 04.1999. Readiness 45% - steel casing
with system pipelines, solid ballast and devices - 2412.6 tons (metal
casing, welded fittings, masts, foundations, reinforcements, etc.);
machinery and equipment - 84,4 tons
https://drive.google.com/open?id=0B5R_LA-zOK0GMG1oZTMyQl83S0E
Ships are located in the shipyards of the Black Sea.
We are ready to give the detailed information and to discuss all conditions
of support of the transaction, including:
the technical inspection of the hulls, both afloat and with possible lifting
to the slipway by your or an authorized surveyor;
customs clearance of the unfinished ship and financial support for the
contract and payments;
conditions of possible repair and conversion of hulls to the haul;
to organize the transportation of the buildings to the completion point;
design and approval of the project of the hull movement. |